Masdar is developing the DEWA Solar PV IPP Phase VI (the Project) on a greenfield site within the Mohammed Bin Rashid Al Maktoum Solar Park plot. The Project will utilize ground-mounted PV technology with minimum accumulated installed capacity of 1800 MW(AC). It is envisaged to be commissioned in three phases i.e., Phase A with 600 MW capacity by 2024, Phase B with 400MW capacity by 2025, and Phase C with 800 MW capacity by 2027. This development aims to optimize its implementation to offer the least cost of electricity generation with high availability and reliability.
Dome has been commissioned by Masdar to undertake the ESIA study for the project.